Dunheved Industrial Estate Remedial Works

ClientLand Lease

Principle Contractor: Ford Civil

Period: Ongoing

Location: Dunheved, St. Marys

Lucas Civil group is proud to be working alongside Ford Civil on stage 1 of the Dunheved industrial estate. The project scope involves considerable bulk earthworks for the creation of multiple building pads on an extensive 35-hectare plot. This project includes the preparation of site to protect against rainfall including the construction of retention basins and drainage swells. Due to asbestos contamination of the excavated material, our plant has been carefully managed to ensure that no cross-contamination occurs between clean and dirty material on site, adhering to industry standards.

Key Features

Cut and fill 700,000m³ up to a depth of 5 meters

Plant hire of 2 x 70T and 2 x 40T excavators

Plant hire of 6 x 40T dumpers

Plant hire of 815B soil compactor

Stockpile of material up to 18 meters

Excavation of burial cells for contaminated materials

500 lin.m quad line of 900mm HDPE stormwater totaling 2km of stormwater drainage

Construction of 6 large insitu structural pits, including double shuttering works.

 
Reo 2
DJI 0304
DJI 0301
DJI 0325

Seymour Shaw Park Stage 2

DJI 0010
DJI 0337

Client: Sutherland Shire council

Principle Contractor: Glascotts Landscaping

Period: January 2026

Location: Miranda Seymour Shaw Park

Lucas civil group prides itself on leaving a legacy for future generations, working alongside Sutherland Shire Council allowed us to do just that. Stage 2 of the Seymour Shaw Park includes the upgrade of the Seymour Shaw Park sports field with improvements made to infrastructure, building amenities, and bleacher seating, making an accessible path network and off-street carparking. Bulk earthworks were completed during a severe weather event which presented challenges, and a significant focus was placed on erosion control to successfully minimise the impact on the adjacent creek.

Key Features

31,000m² of topsoil stripping

12,000m³ of cut-to-fill

Import of 6000m³ of fill material

Plant hire – 35T and 40T excavator

Plant hire – 40T dumper

Plant hire – D6 dozer

Plant hire – 140m grader and 825 compactor 

Gregory Hills Stage 2

Client: Bronxx PTY LTD

Principle Contractor: Lucas Civil Group

Period: December 2025

Location: Turner Road, Gregory Hills

Gregory Hills stage 5 is a residential area on Turner Road consisting of 19 lots on an 8000m² plot. This job required LCG to strip and excavate site down to the natural underlying material, including up to 6m of vertical cut.

Key Features

Utilized plant including 35T and 40T excavators, D8 dozer, 815B compactor, and 50T jaw crusher

17,000m³ of bulk earthworks export

1000m³ of cut to fill

200 lin.m of 300mm interalotment stormwater drainage installed behind, under and along retaining walls.

880m2 of retaining walls installed ranging from 0.4m to 4.0m

Design and construct retaining walls, and complex interface works

Locally and internationally sourced materials

DJI 0113
DJI 0275
DJI 0216

Wash Zone Car Wash Stage 1

Client: Kamm Group

Principle Contractor: Lucas Civil Group

Period: March 2025

Location: Edwards Road, Rouse Hill

Lucas Civil Group is proud to have worked on stage 1 of the Wash Zone Car Wash project on Edwards Road in the Rouse Hill area. Once completed, this 2000m³ plot was to include 4 bay self-serve car washes, 1 automatic car wash and a dog wash. This project represented a major milestone for Lucas Civil Group as our first project successfully delivered as Principal Contractor.

Key Features

Topsoil stripping

Utilized plant including 25T, 14T, and 8T excavators, as well as various rollers

500m³ of detailed cut to fill

1500m³ of bulk earthworks export

80 lin.m of 300mm stormwater drainage installed

Installation of ocean protect UPT

Trim, prep, form, reo, and pour 1300m² of concrete

 
 
 
 
 
 
 
 
 
 
 
car wash 4