Lucas Civil Group delivers professional stormwater installation and plant hire services across a diverse range of civil infrastructure projects. Our portfolio showcases extensive experience and proven capability across residential, commercial, and industrial sectors.
Dunheved Industrial Estate Remedial Works
Client: Land Lease
Principle Contractor: Ford Civil
Period: Ongoing
Location: Dunheved, St. Marys
Lucas Civil group is proud to be working alongside Ford Civil on stage 1 of the Dunheved industrial estate. The project scope involves considerable bulk earthworks for the creation of multiple building pads on an extensive 35-hectare plot. This project includes the preparation of site to protect against rainfall including the construction of retention basins and drainage swells. Due to asbestos contamination of the excavated material, our plant has been carefully managed to ensure that no cross-contamination occurs between clean and dirty material on site, adhering to industry standards.
Key Features
Cut and fill 700,000m³ up to a depth of 5 meters
Plant hire of 2 x 70T and 2 x 40T excavators
Plant hire of 6 x 40T dumpers
Plant hire of 815B soil compactor
Stockpile of material up to 18 meters
Excavation of burial cells for contaminated materials
500 lin.m quad line of 900mm HDPE stormwater totaling 2km of stormwater drainage
Construction of 6 large insitu structural pits, including double shuttering works.
Seymour Shaw Park Stage 2
Client: Sutherland Shire council
Principle Contractor: Glascotts Landscaping
Period: January 2026
Location: Miranda Seymour Shaw Park
Lucas civil group prides itself on leaving a legacy for future generations, working alongside Sutherland Shire Council allowed us to do just that. Stage 2 of the Seymour Shaw Park includes the upgrade of the Seymour Shaw Park sports field with improvements made to infrastructure, building amenities, and bleacher seating, making an accessible path network and off-street carparking. Bulk earthworks were completed during a severe weather event which presented challenges, and a significant focus was placed on erosion control to successfully minimise the impact on the adjacent creek.
Key Features
31,000m² of topsoil stripping
12,000m³ of cut-to-fill
Import of 6000m³ of fill material
Plant hire – 35T and 40T excavator
Plant hire – 40T dumper
Plant hire – D6 dozer
Plant hire – 140m grader and 825 compactor
Gregory Hills Stage 2
Client: Bronxx PTY LTD
Principle Contractor: Lucas Civil Group
Period: December 2025
Location: Turner Road, Gregory Hills
Gregory Hills stage 5 is a residential area on Turner Road consisting of 19 lots on an 8000m² plot. This job required LCG to strip and excavate site down to the natural underlying material, including up to 6m of vertical cut.
Key Features
Utilized plant including 35T and 40T excavators, D8 dozer, 815B compactor, and 50T jaw crusher
17,000m³ of bulk earthworks export
1000m³ of cut to fill
200 lin.m of 300mm interalotment stormwater drainage installed behind, under and along retaining walls.
880m2 of retaining walls installed ranging from 0.4m to 4.0m
Design and construct retaining walls, and complex interface works
Locally and internationally sourced materials
Wash Zone Car Wash Stage 1
Client: Kamm Group
Principle Contractor: Lucas Civil Group
Period: March 2025
Location: Edwards Road, Rouse Hill
Lucas Civil Group is proud to have worked on stage 1 of the Wash Zone Car Wash project on Edwards Road in the Rouse Hill area. Once completed, this 2000m³ plot was to include 4 bay self-serve car washes, 1 automatic car wash and a dog wash. This project represented a major milestone for Lucas Civil Group as our first project successfully delivered as Principal Contractor.
Key Features
Topsoil stripping
Utilized plant including 25T, 14T, and 8T excavators, as well as various rollers
500m³ of detailed cut to fill
1500m³ of bulk earthworks export
80 lin.m of 300mm stormwater drainage installed
Installation of ocean protect UPT
Trim, prep, form, reo, and pour 1300m² of concrete